User Tools

Site Tools


nsw_dems

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
nsw_dems [2021/02/10 14:03] bushwalkingnsw_dems [2021/02/17 20:46] bushwalking
Line 1: Line 1:
 ====== Managing large DEMs ====== ====== Managing large DEMs ======
  
-===== Downloading data =====+===== Intro =====
  
 While data can be downloaded in an ad hoc manner, if you are regularly processing DEMs, it is better to have the DEM tiles already downloaded.  While data can be downloaded in an ad hoc manner, if you are regularly processing DEMs, it is better to have the DEM tiles already downloaded. 
 +
 +Once downloaded, pre-process the tiles into GeoTIFFs, build a virtual raster for each 1:100k grid square. You can then build a virtual raster of virtual rasters!
 +
 +===== Downloading data =====
  
 Download tiles by 1:100k map area, which is 0.5 x 0.5 degree squares. Each 1:100k map area ranges from around 2GB to 6GB of data, depending on the number of 2m DEMs vs 1m DEMs, and other factors. Download tiles by 1:100k map area, which is 0.5 x 0.5 degree squares. Each 1:100k map area ranges from around 2GB to 6GB of data, depending on the number of 2m DEMs vs 1m DEMs, and other factors.
nsw_dems.txt · Last modified: 2023/11/23 15:01 by bushwalking

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki